Naples, Florida Golf Course Home
Location: In the border of the city Spišská nová Ves in the
direct of Teplička. Individual halls and buildings are in good conditions and comunication ways are asphaltic.
Total
measurement: 67,875 m2
In the area are situated:
Production hall built up in 1991. Shingle walled, external
wooden
thermal isolation, flooring by concrete and covered
by asphalt. Built up area 648 m2 and hight 5 m.
Drying slab:
Single deck building built up in 1994 and serve for drying
of wood.
Social building, storages and
garages:
Previous building from the year of 1948 and reconstructed
in 1994 plus superstructure and annex. Building is
walled
and twin-deck. On the first floor are two storages
and garages and on the second floor are offices
and
dressingroom, sanitary instalation. In annex are storage
and archive.
Machine-room and boiler:
Building is
partly basement with two floors. Building consist
of boiler, vice manufactory exchange station.
Accumulator room,
storages and sanitary instalation,
central heating, canalisation, water and electroinstalation,
material brick block.
Administration building:
Built up in 1978.
Offices and sanitary instalation, dinning-room, buffet,
exchange station, material from brick block.
Reconstructed in 1996. Central heating ? radiators.
Lightning
conductor, warm and cold water.
Trafostanica:
Built up by bricks and blocks.
Vellum sized pole
Individual
object built up in 1980 made by brick block.
Scroll hall:
Single-deck building with three parts.
Hall with
incorporate part. Product of wooden scroll.
Buit up in 1976 in good conditions. In second and third parts
are sawmill
and modification of wood.
Sawmill and sizing hall:
Sizing hall: Single-deck object for sizing of slab.
Building is
wooden and not isolated. Building is used for
processing of the pole. Bottom is made by bricks
and top by wood.
Flooring by cocrete and covered by asphalt.
EL. 220/380.
Oil storage 1:
Objekt is wooden and built up in 1996. Used
for storage
of pablum.
Oil storage 2:
Walled building from brick block. Build up 1947.
Used for storage of
pablum.
Offices for despatch:
Single-deck building, built up in 1994. Wooden montage with
isolation. Saddle roof.
Electrically heating apparatus.
Offices and storage of pole
Single-deck object, oblong section plane, used for offices
and dressingroom, built up in 1976, saddle roof, wooden floor,
heating by electricity.
Shelter scroll
splitter
Built up in 1996
Annex to sawmill
Built up in 1993, for production purpose.
Palette
Built up in
1996, used for writhe of wooden EURO palette
3 annexes
Built up 1994, annex No.1 bbbuilt up area 789m2, hight 4.30m
and two abreast annex with built up area of 576m2, uuusing for
drying of wood.
Gate-house
Twin-deck object,
using for control of entering and exit
of personals, cars and visitors. Built up in 2002.
Building material is wood,
roof by asphaltic shingle. Water,
sanitary instalation, canalisation, electricity 220/380,
electrical
heating.
Chimney
It?s oldest part and built up in 1935. Reconstructed in 1995.
Hight of the chimney is 40m. All the
area was fenced in 1987.
Made by steel columns. Hight 2,2m, lenght 963m,
good communication ways in the area built up
in 1996.
Measur